Moldes para fundição sob baixa pressão (LPDC)
Moldes para fundição por gravidade
Moldes de fundição por contrapressão (CPC)
Molde para fundição de peças estruturais
Molde de fundição para cubo de roda de motocicleta
Molde de fundição por pressão diferencial para cub
Molde para fundição por gravidade de cubos de roda
Baixa pressão no cubo da roda
Aluminum alloy casting mold quotation difference: why is the same drawing 30% different
The price difference of the same drawing is 30%, mainly concentrated in four aspects: steel type, heat treatment, processing method, and testing.
1、 Steel grade and material certification
Low priced solutions often use general-purpose hot work steel with a chromium content of less than 3% and weak thermal fatigue resistance of about 30%.
The quotation for providing material certification usually has a steel cost that is 8% to 12% higher.
The price difference of cavity steel can account for 15% of the total mold cost.
2、 Heat treatment process
The scheme of double tempering and full hardness inspection is about 5% more expensive than single tempering, but the early cracking rate is about 35% lower.
The quotation without heat treatment curve often eliminates the need for testing and insulation time.
Nitriding or coating treatment can increase the quotation by 3% to 8%, but the demolding resistance can be reduced by about 15%.
3、 Processing method
The difference in cavity tolerance between five axis precision machining and ordinary three-axis machining can reach 0.03 millimeters.
High speed processing can shorten the lead time by about 20%, but the equipment cost will be reflected in the quotation.
Polishing the cavity to Ra1.6 and Ra3.2 results in a labor cost difference of approximately 20%.
4、 Detection and documentation
The quotation for a plan that includes three coordinate full-size, non-destructive testing, and mold testing records is usually 5% to 10% higher.
Omitting the quotation for testing may result in later repair costs exceeding the price difference.
The Xinfeng quotation list specifies the steel grade, heat treatment, processing accuracy, and testing items for easy horizontal comparison.
5、 Comparison method
Break down the quotation into five items: materials, processing, heat treatment, testing, and mold testing, and compare them one by one.
When the price difference of a single item exceeds 15%, it is advisable to inquire about the differences in craftsmanship rather than directly bargaining.
Industry data shows that price splitting can reduce disputes over later price increases by about 30%.
Conclusion and Outlook
The price difference is not artificially high, but the externalization of configuration differences.
Comparing items, questioning processes, and verifying documents can better control costs than simply lowering prices.
Extension: Three Compression Methods Behind Low Quotations
Shortening the heat treatment cycle, although the hardness meets the label requirements, the internal stress is not fully released.
Reduce the number of detection points, measure only the critical surfaces with three coordinates, and accumulate deviations from non critical surfaces.
The machining allowance of the cavity is increased, and the polishing time is reduced by about 20%, but the service life is reduced.
The three types of compression do not show any problems in the short term, and will be exposed after mass production of 3000 molds.
The identification method is to compare the quotation with the process card item by item, and the gaps are clear at a glance.
After comparison, a hidden shrinkage of 5% to 15% can usually be found.
Addendum: Understand the four key points of the quotation
The quotation should be divided into five items: materials, processing, heat treatment, testing, and mold testing, for easy horizontal comparison.
When the unit price is more than 20% lower than peers, it is necessary to inquire whether the tempering or flaw detection process has been omitted.
A quotation with a delivery time compression of more than 30% usually comes at the cost of sacrificing inspection time.
The quotation with attached process card and inspection checklist has significantly higher credibility.
Addendum 2: Three actions for evaluating quotations
Require suppliers to provide process cards, and it is clear whether the heat treatment and testing processes have been omitted.
Check the tolerance of the mold cavity and the number of inspection points. Parameter shrinkage is often hidden in details.
Only by including the delivery time and acceptance conditions in the inquiry sheet can the quotation be comparable.
FAQ
Why is there a 30% difference in quotation for the same image? The steel grade, heat treatment, processing, and testing are different.
What steel is commonly used in low-priced solutions? General hot work steel often has a chromium content of less than 3%.
What is the price difference for heat treatment? The full inspection plan is about 5% more expensive and has a lower cracking rate of about 35%.
What is the difference in machining tolerance? The difference between five axes and three axes is 0.03 millimeters.
What is the value of the detection item? The quotation with full inspection is usually 5% to 10% higher.
How to compare prices more accurately? Divide into five items and compare them one by one.
Is bargaining effective? It's better to inquire about the differences in craftsmanship.
Moldes para fundição por baixa pressão (LPDC)
Moldes para fundição por gravidade
Moldes para fundição por contrapressão (CPC)
Moldes para fundição de peças estruturais
Molde para fundição de cubos de roda de motocicleta
Molde para fundição por pressão diferencial de cubos de roda
Molde para fundição por gravidade de cubos de roda
Molde para fundição por baixa pressão de cubos de roda
MOLDES PARA JANTES AUTOMÓVEIS
PEÇAS ESTRUTURAIS AUTOMÓVEIS
OUTROS COMPONENTES DE FUNDIDOS DE ALUMÍNIO
PERFIL DA EMPRESA
ESTRUTURA ORGANIZACIONAL
HISTÓRICO DE DESENVOLVIMENTO
PROPRIEDADE INTELECTUAL
ESPÍRITO DE EQUIPA PARCEIRO
Copyright © Zhejiang Xinfeng Machinery Co., Ltd. All Rights Reserved.